LATEST PROJECT
The original tub was longer than today's "standard" so the end wall had to be restructured. Roxul was used to insulate the walls and GPs DensShied backer board was used for it's excellent waterproof properties. Parts of the floor had to be repaired using spare and salvaged tiles.
All tiles were set in mortar for strength, mold resistance and longevity.
The window was replaced with a custom sized unit from Van Isle Windows. The window sill was fitted with a one-piece custom cultured marble slab, pitched to shed water.
No comments:
Post a Comment